Sabah Drawing Checks Are Open!
PENGHANTARANSABAH · DRAWING BUREAU
DWGSBH-010REVA

CORRIDOR DRAWING / M-01

RORO describes vehicle movement—not a promise for every route.

Roll-on/roll-off generally means a vehicle is driven on and off a vessel. Actual availability still depends on the route, vessel and booking acceptance.

Trace the dimensions
Departure terminalArrival terminal
RORO describes vehicle movement—not a promise for every route.
DATUM / PKGDETAIL / ROROEND / BKI

CONTROL POINTS / 01

Six dimensions hold the corridor together.

Each callout names an input that must be resolved before the next handover.

  1. C-01
    Origin datum

    Origin datum

    Confirm Northport or Westport.

  2. C-02
    Vehicle envelope

    Vehicle envelope

    Class, dimensions and running state.

  3. C-03
    Method detail

    Method detail

    RORO or container acceptance.

  4. C-04
    Document note

    Document note

    Identity, ownership and authority.

  5. C-05
    Evidence views

    Evidence views

    Four corners, cabin and odometer.

  6. C-06
    Release point

    Release point

    Named receiver and optional land scope.

ROUTE NOTES / 02

Resolve the annotations before movement.

N-01

Confirm unit suitability

Dimensions, running condition and vehicle type need review before a method is selected.

N-02

Understand terminal handover

RORO does not automatically mean door-to-door. The handover and collection points must be stated.

N-03

Avoid schedule assumptions

Schedules change. Use dates only after current operational confirmation.

HANDOVER TRACE / 03

Five inputs make a slot check usable.

  1. D-01Vehicle starts and moves
  2. D-02Leaks or damage are disclosed
  3. D-03Ownership documents are available
  4. D-04Loose accessories are removed
  5. D-05Fuel and personal-item policies are confirmed
Port Klang
01 / PORT KLANG
South China Sea crossing
02 / SEA
Sabah RORO release
03 / SABAH

REVISION QUESTIONS / 04

Questions that can revise the drawing.

Q-01Is RORO available on every route?

Not necessarily. Availability must be checked against the terminal, vessel and current booking.

Q-02Can a motorcycle use RORO?

That depends on the operator acceptance and handling method for the route.

Q-03Is RORO the same as a container?

No. They are different operating methods; suitability depends on the unit and route.

CORRIDOR CHECK / WHATSAPP

Pin the origin. Match the Sabah release.

Chat on WhatsApp