Confirm the terminal first
The handover point depends on the actual route and booking. Do not travel to a terminal before confirmation.
CORRIDOR DRAWING / C-01
Start with the origin, vehicle type and preferred month. The terminal, method and expected sailing window follow an operational review.
Trace the dimensions ↓
CONTROL POINTS / 01
Each callout names an input that must be resolved before the next handover.

Confirm Northport or Westport.

Class, dimensions and running state.

RORO or container acceptance.

Identity, ownership and authority.

Four corners, cabin and odometer.

Named receiver and optional land scope.
ROUTE NOTES / 02
The handover point depends on the actual route and booking. Do not travel to a terminal before confirmation.
Sailings and collection timing can change with port operations. A planning window follows a vehicle review.
Initial details, the checklist and handover updates move through WhatsApp once the service number is active.
HANDOVER TRACE / 03



REVISION QUESTIONS / 04
Do not assume they can. The applicable vessel and route policy must be confirmed before handover.
No. Vehicle dimensions, terminal, direction and confirmed operating option can affect the quote.
Only after the terminal, handover date and required documents have been confirmed through the official channel.
CORRIDOR CHECK / WHATSAPP