Sabah Drawing Checks Are Open!
PENGHANTARANSABAH · DRAWING BUREAU
DWGSBH-010REVA

CONTAINER DETAILS / SHEET 01

Keep container handling as a separate drawing.

Acceptance, alignment, restraint, seal and release belong to the actual facility plan.

Open annotation sheet
Acceptance
CONTAINER DETAILSDETAIL 01 / 06

ANNOTATIONS / 01

Resolve every numbered note in order.

Each annotation keeps the required input attached to its evidence and confirmation state.

  1. N-01Acceptance
    Acceptance

    Confirm size, state and facility acceptance.

  2. N-02Positioning
    Positioning

    Place the vehicle with planned clearance.

  3. N-03Restraint
    Restraint

    Use the approved securing arrangement.

  4. N-04Seal
    Seal

    Record the applied seal and container identity.

  5. N-05Protection
    Protection

    Control contact points and loose items.

  6. N-06Release
    Release

    Match receiver before opening or collection.

CONTROL BLOCK / 02

The confirmed facility controls the method.

A

Confirm first

Facility, dimensions, restraint and release.

B

Retain together

Keep the issued record, dated evidence and acknowledgement in one thread.

NOTE CHECK / WHATSAPP

Confirm the requirement before handover.

Chat on WhatsApp